nyc dot traffic standard drawings

rahbari
» sahale snacks copycat recipe » nyc dot traffic standard drawings

nyc dot traffic standard drawings

nyc dot traffic standard drawings

 کد خبر: 14520
 
 0 بازدید

nyc dot traffic standard drawings

OFFICE. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. IES classification of lighting based on its photometric properties. New York, NY 10013 Kew Gardens, NY 11424 FULL CURB LANE RESTORATION WOULD BE REQUIRED FOR 8' WIDTH OF CURB LANE AND THE LENGTH OF ALL CUTS PLUS ANY LL14 CUTBACKS. Fax: (718) 816-9194 APPROVAL FROM THE LANDMARK PRESERVATION COMMISSION IS REQUIRED BEFORE WORK COMMENCES. Incorrect Information on File If a permittees 24/7 phone number, address or other contact information is inaccurate or has changed without being updated, all future permit requests may be placed on hold until the information is updated. Homeowners applying for Sidewalk Construction permits who intend to do the work themselves do not need to register. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. 55 Water Street, Concourse Level Any foundation material not meeting specifications must be removed. Additional requirements are contained in Sections 2-02 and 2-05 of the Highway Rulesand should be consulted before any work is performed on the street. FULL BUILDING LINE RESTORATION IS REQUIRED FOR WIDTH OF THE ROADWAY. Attn: Forestry FIRE/EMERGENCY ACCESS/EVACUATION POINTS FOR ALL BUILDINGS CANNOT BE ENCROACHED. Concretemust be poured and finished in accordance with NYC DOT Standard Highway Specifications. "Base course" refers to the layer of material below the wearing course. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The NYC DOT Bureau of Permit Management and Construction Control (the Bureau) is responsible for overseeing all construction-related permitting. Registration applications should be printed on 8 1/2"x 14" paper. A sidewalk is the portion of a street, intended for the use of pedestrians, between the roadway and adjacent property lines. Cranes may require permits from DOB in addition to NYC DOT. New York, NY 10038 FULL INTERSECTION RESTORATION WILL BE REQUIRED WHEN MORE THAN 50% OF THE INTERSECTION IS EXCAVATED. Street Arterial Maintenance (SAM) hold A Street Opening Permit request to perform work on a protected street will automatically have a SAM hold placed on it if the proposed work start date is within 18 months of the street being resurfaced/reconstructed. Print his/her name and title and provide a signature. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. CPO holds will typically be released by DDC if the proposed work does not interfere with its schedule. The second permit for canopy maintenance is automatically placed on a. NYC DOT issues permits for two types of vaults: building vaults and transformer vaults. Bronx, NY 10457 The permittee may apply for a renewal online, or in-person by accessing either theApplication to Renew Permitsor theApplication to Renew Governmental Permit(s). Included are topics about Policy, Procedures, Specifications and Design Standards (Manuals, Guidelines, and Computer Aided Design and Drafting drawings). Department of Transportation These include major construction related projects or planned traffic enhancements (e.g., Second Avenue subway, bus rapid transit, water tunnel route), or where there are significant traffic issues (e.g., thru streets, exits and entrances to major tunnels and bridges). STLRES-RESTORE AS PER SKETCH #3 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. (If the homeowner is using a contractor, the contractor must be registered with NYC DOT and must take out the permit.) (718)786-8589 OR (718)786-8407, ONE SPEED REDUCER IS LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. 3.1 General Provisions For Construction-Related Permits Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. (NAME AT LEAST 2). Fax: 718-556-7305, The Bronx (212) 839-8856, The Bronx * Clear Path (pedestrian walkway): This directive is intended to provide pedestrians with the maximum amount of safety and space to traverse the sidewalk. If work is planned through the HE period, the critical reasons for the work must be included in the Work Description field of the application. DOTs lighting-levels and uniformity guidelines are based on those established by the IES Roadway Lighting standard RP-8-14 (or more stringent where needed). NYC DOT's concrete repair schedule for roadways, sidewalks and other assets in the street can also be accessed from this link. font size. NYC DOT also routinely meets with utility companies and others who perform street excavations to inform these organizations of upcoming events and major construction projects with which NYC DOT is involved. PLACE LEFT LIGHTED ARROW BOARD 24/7 NE CORNER OF AMSTERDAM AVE/W.60 ST. NO IMPACT ON 4 TRAVEL LANES AT ANY TIME. All of these signs are metal and include the agency name and sign code. No attachments of any kind are permitted on a canopy, including, but not limited to temporary or permanent signs, balloons, streamers, flags, banners or pennants. Fax: (718) 430-4663 THIS WORK HAS PRIORITY OVER OTHER NON-EMERGENCY WORK ON STREET SEGMENT. Applicants must submit a completed permit application. Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. If the insurance is not current, the request will be denied. A Full Closure Review (FCR) hold is triggered when a street is closed for 90 days. View more information and instructions for obtaining a revocable consent. Building Operations/Construction Activity Permits are generally taken out by entities that perform construction activities, including developers and contractors. All street lighting designs must be approved by DOT Street Lighting Engineering Unit. Registered Permittees may apply, pay for and print their permits anytime anywhere using the NYCStreets Permit Management online system. See, Utilize recycled content in paving materials. nyc.gov/dot. For questions, Monday to Friday from 8:30 AM until 5:00 PM. 6. MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. The pedestal is monolithically poured with the foundation. MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. MUST COMPLY WITH DEP NOISE REQUIREMENTS. Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. The concrete base must be restored at the same grade as the existing base; at no time may it be brought up to the asphalt course unless authorized by NYC DOT. If it is determined to be unfeasible, the pending permit will be rejected. MUST COORDINATE WITH RESIDENT ENGINEER NYSDOT MR.WONG AT 718-499-7075 PRIOR TO WORK. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. The requested permit must be appropriate for the type of work that is planned. The Queens borough permit office is located in Queens Borough Hall. Check traffic advisories. DURING RESTORATION SAW CUTTING IS REQUIRED AS PER DRAWING H-1042A, THE PERMITTEE IS NOT PERMITTED TO ENTER, OCCUPY OR USE ANY PUBLICLY-OWNED OR PRIVATELY OWNED, NON-PAVED, LANDSCAPED OR NON-LANDSCAPED LOCATION WITHOUT SPECIFIC WRITTEN PERMISSION. 47-40 21st Street 10 Richmond Terrace, Room 309 A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. 811 or 800-272-4480. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHEAST QUADRANT OF THE INTERSECTION. Division of Traffic Engineering Fax: (212) 361-1900, Queens MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. Office hours: 8:30 AM-5:00 PM, Manhattan 22 Reade Street, 6th Fl. MICROSTATION SHEET MODELS. It draws from a wide range of resources and experience to present a coherent set of choices for street design. CTDOT_Traffic . Brooklyn, NY 11241-0103 THE ROADWAY AND/OR SIDEWALK SHALL BE REPLACED IN-KIND. Manhattan / Central Permit Office When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. The hold is to review the proposed work and set conditions for the work and/or restoration. THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications. (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) > 645 Signs: . NYC DOT may order a vault licensee or the owner of the premises where the vault is located to fill in an abandoned vault. WORK IS PERMITTED BETWEEN 9AM AND 6PM SATURDAY FOR THE SOLE PURPOSE OF DISCONNECTING THE CUSTOMER FROM THE OLD GAS MAIN, AND RECONNECTING THE CUSTOMER TO THE NEW GAS MAIN. Transverse SlopeSidewalks must be laid to pitch from the building line toward the curb. To request release of a CAN hold, the applicant must contact the HIQA borough office in the borough in which the canopy is installed to arrange for a final inspection following canopy installation. DO NOT PLACE ON MTA/NYCT ANTENNA POLES. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR FULL INTERSECTION RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Applicants should indicate on the application, Application for Governmental Work Permit(s), their name and the name of the governmental agency or authority for which they are working. Sidewalk Construction Permits are designated as the "04" permit series, meaning all permits in this category begin with "04". Manhattan.Forestry@parks.nyc.gov In order to maintain world-class streets, permits must be obtained for the work performed in the street. Standard Drawings are not currently available for download from the shaded states. Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. DOT SIGNALS APPROVED PLANS. Office hours: 8:30 AM-4:30 PM, Brooklyn The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. Some of the requirements include but are not limited to: Expansion JointsExpansion joints must be placed at 20-foot intervals, expansion joint filler material must be placed to the full depth of the sidewalk, and all expansion joints must be recessed and sealed. MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 9 AM TO 2 PM AND 3:30 PM TO 6 PM MON. To request a release of a SAM hold, the borough ASHO must be contacted to discuss the work and allow the ASHO to determine the extent of the restoration requirements. Whenever a permit has been issued in error and the conditions are such that the permit should not have been issued. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. ALL WORK MUST BE PREAPPROVED BY LANDMARK PRESERVATION COMMISSION. Tel: 212-720-3300 Other requirements may apply to the movement of cranes within city limits, such as daily or annual over-dimensional travel permit(s) as issued by NYC DOT. An Occupancy of Sidewalk Permit is required when either more than 3 feet from the property line is obstructed by a fence or a minimum of 5 feet of clear path cannot be maintained for pedestrians, or as otherwise stipulated. The contact information and hours of operation for all Permit Offices can be found in Appendix C, NYC DOT Contact Information. WORK SHALL BE PERFORMED IN ACCORDANCE WITH NYCDOT'S SPECIAL EVENTS OFFICE REQUIREMENTS RELATED TO A SPECIAL EVENT, AS IDENTIFIED IN THEIR EMAIL, WHICH MUST BE KEPT ON-SITE WITH ALL ACTIVE PERMITS WHILE THE APPROVED WORK IS BEING PERFORMED. 4. Its overall goals are both far-reaching and vital: sustaining the city's investment in its streets, enhancing access to subsurface infrastructure and minimizing transportation and community disruptions. Fax: (212) 860-1359 THIS PERMIT INCLUDES AUTHORIZATION FOR THE STORAGE OF EQUIPMENT (OTHER THAN CRANES) AND MATERIALS ON THE JOB SITE ONLY, INCLUDING JERSEY BARRIERS IF APPLICABLE. If all the documentation is accepted, pre-determined permit stipulations are added to the permit and the application is sent for processing. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. NYC DOT registers permittees, and coordinates and issues permits for construction-related activity on streets. http://mutcd.fhwa.dot.gov back to top N New York 811, Inc. An application for a Street Opening Permit on a protected street will automatically be placed on a Street Arterial Maintenance (SAM) hold if the proposed work is to start within 18 months of the street being resurfaced or reconstructed. In order to apply for an embargo waiver, a Request for Roadway/Sidewalk Permits during Embargo Periods form must be submitted for review and consideration to the Permit Office. CLOSURE GRANTED AT REQUEST OF SCA LETTER. The second option is available for applicants who do not have the technology to use the above procedure. Transformer vaults are typically installed, owned and maintained by an electric utility company. Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. 8:30 AM to 4:30 PM, Lower Manhattan (south of Canal Street) NO NOISY OPERATIONS MAY OCCUR AFTER 10:00 PM. All other inquiries: (212) 748-6610 However, if extraordinary conditions are present, the applicant may be asked to meet with OCMC. Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York. Division of Review & Construction Compliance (718) 595-5223 or (212) 839-9561/9566 The form must be completed and faxed to NYC DOTs Emergency Authorization Unit (EAU), which will confirm that the applicant's insurance is current and that the location requires an EAN. For complete NYC DOT requirements regarding the performance of work in the street, please consult the Highway Rules and NYC DOT specifications. VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. Cobra Head fixture on standard lamppost This chapter, which constitutes the current DOT Street Lighting Catalogue, outlines options for street and pedestrian lighting for New York City streets, bikeways, pedestrian bridges, pedestrian malls, plazas, and parks. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. SPECIFICATIONS. Queens The permittee must attach a copy of the original permit to the application when requesting a re-issuance and all applicable reviews and fees will apply. All other times - (718) 433-3340, From 7:00 AM to 3:30 PM, Monday to Friday: (212) 839-9697/99 or 9688 CRITERIA & PROTOTYPE FOUND AT: THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB LANE ONLY RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. NYC DOT hosts borough-level meetings to discuss the scheduling of upcoming resurfacing projects with utility companies and other potential street excavators. By eliminating manual steps, most permit requests now may be approved and issued within 1-2 business days. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The Bronx The term "street" means a public street, avenue, road, alley, lane, highway, boulevard, concourse, parkway, driveway, culvert, sidewalk, crosswalk, boardwalk, viaduct, square or place, except those streets adjacent to any waterfront property designated as a marginal street on a city map. 40 Worth Street 8th Floor THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR 12"BEYOND FURTHEST CUT TO CURB LINE FOR ALL CUTS AS AGREED TO W ITH THE BOROUGH ASHO'S OFFICE. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. Projects requiring sidewalk closure may require additional permits. The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. RESTORATION OF ROADWAY WHICH HAS GREEN COLORED BIKE LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF GREEN # 105953 RIDE-A-WAY COATING MATER'L MFG'D BY FLINT TRADING INC OR EQUIVALENT. IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. AND THAT THE PREVAILING SCALE OF UNION WAGES SHALL BE THE PREVAILING WAGE FOR SIMILAR TITLES AS ESTABLISHED BY THE FISCAL OFFICER PURSUANT TO SEC. Typically, permits must be kept at the work site or designated field headquarters at all times and must be made available for inspection. SignageSigns must be displayed at the work site or at 100-foot intervals along a series of excavations or continuous cuts indicating the name of the entity performing the work, the name of the entity for whom the work is being performed and, if applicable, the name(s) of the subcontractor(s). The applicant must satisfy all of the requirements listed in section 2-02(a) (3) of the. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. Fax: (718) 965-7753 WORK 9 PM TO 6 AM NIGHTLY. DOT is also testing solar-powered lighting at select locations in flood-prone areas. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Apply for a parking permit. A sketch showing the canopy dimensions, location and all street facilities and furniture within 15 feet of both sides of the proposed canopy. Each applicant must obtain and provide Worker's Compensation insurance in accordance with the laws of the State of New York from a licensed insurance company. WORK HOURS 7 AM - 10 PM MON-FRI, AND 10 AM - 7 PM SAT AND SUN. 5. These forms may also be found inAppendix B, Forms. The organization of the Street Works Manual generally follows the chronological process of planning and undertaking work in the street. WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF ANY OTHER JURISDICTION SUCH AS PRIVATE PROPERTY, STATE, FEDERAL ETC., IT IS THE PERMITTEES RESPONSIBILITY TO DETERMINE THE PROPERTY OWNER AND OBTAIN THE WRITTEN APPROVAL. WORK 9 AM TO 7 PM SATURDAY AND 10 AM TO 7 PM SUNDAY. ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. VERMEER CUT OF TRENCH. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. number as provided by the Internal Revenue Service (IRS). (5mb). PAVEMENT MUST BE RESTORED IN KIND. CONNECT WITH US. A single PDF of the 619 Standard Sheets is available at the . To request release of a Revenue hold, the permittee must contact NYC DOT's Fiscal Affairs Office to arrange for payment of outstanding bills. Attn: Forestry Real-Time Traffic Conditions & Cameras. Office hours: Applications accepted, only from 8:00 AM to 11:30 AM; OCCUPY TWO 11 FOOT LANES 12:01 AM TO 5 AM NIGHTLY. Outlined below are the basic procedures in applying for a Sidewalk Repair Permit by mail: The New York City Click here to download. THE VMS BOARD MUST STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF SUCH CLOSURE. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. COMPLY WITH DOT STANDARD #H1042C. Canopy authorizations and permits are required to place a canopy over the sidewalk. BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATE NOISE MITIGATION PLAN. WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. This information should be used to plan work before streets go into protected street status. TO FRI. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. ROADWAY MUST BE RESTORED IN KIND. Following are the specific steps for canopy authorizations and permits: A permit must be obtained to install the canopy at the approved location (Erect Canopy Permit from the "01" Street Opening Permit series). IF MULTIPLE LANES ON GOWANUS IN SAME DIRECTION AS MILLING, NO MILLINGY WORK MAY OCCUR. 40 Worth Street 8th Floor POSITIONING OF TRAFFIC SIGNS (TOTAL OF . This form cannot be used if the permit has already expired. RESTORE ALL TRAVEL LANES TO TRAFFIC. WHEN SCHOOL IS OUT MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 7 AM TO 6 PM MON. POST SIGNS MEETING NYCDOT SPECIFICATIONS FOR DIRECTING PEDESTRIANS TO OPPOSITE SIDEWALK. CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR EXTENDED TRENCH MORE THAN REGULAR CUT-BACK AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. If the applicant intends to do work associated with a Franchise, Concession or Revocable Consent Agreement, the applicant must have a copy of the Agreement prior to applying for a permit. Permit windows at the central Permit Office. If no changes are required, the permit will be released. 8:30 AM to 4:30 PM, Manhattan New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . RESTORATION OF ROADWAY WHICH HAS RED COLORED BUS LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF TERACOTTA #103856 RIDE-A-WAY COATING MATER'L MFG'D BY INTERGRATED PAVING CONCEPTS INC OR EQUIVALENT. OCCUPY 15 FEET OF E/S CURB LANE. Find community presentations. Fax: (212) 788-3086, New York State Department of Environmental Conservation (DEC) A permit is required to place any construction trailer or similar structure in the street. DESIGNATED LANDMARK AREA. (718) 391-1937 ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. THIS EXECPTION DOES NOT APPLY IF STIPULATION 014 IS ALSO APPLIED TO THIS PERMIT. Crane placed on the street for construction activity. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Some of the requirements include, but are not limited to the following, where the applicant must: New York 811 is a nonprofit organization that acts as a communications link between utility companies and individuals planning any digging activity in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island. THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. The applicant can also request a new vault license for an existing vault by submitting SCARA plans and make a one-time license fee of $2 per square foot. Signs must be conspicuously displayed and face the nearest curb line. While the situation is evolving, the agency remains committed to applying the principles and proven treatments included in the Street Design Manual to support the health and safety of all New Yorkers. DESIGNATED AS A FULL DEPTH CONCRETE ROADWAY THAT MUST BE RESTORED IN KIND AS PER DOT STANDARD SPECIFICATION #1042A&B. NYPD AGENTS AND VMS BOARDS REQUIRED AS PER MEC01-36. In-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted to the central Permit Office in Manhattan. These applications can be submitted online using NYCStreets. If the installed canopy fails final inspection, HIQA will reject the canopy maintenance permit and notify the applicant of the rejection. The applicant will also be notified of any corrective action necessary and recourses available. NYC Parks & Recreation Permit Review is the process by which NYC DOT reviews permit applications and supporting documentation and makes determinations regarding the issuance of permits and permit stipulations. Unauthorized removal of muni-meters is prohibited. Fax: (718) 858-0069, Manhattan Brooklyn, NY 11202 Home | Pedestrian Ramp Program The Office of Construction Mitigation and Coordination (OCMC) reviews all construction permit applications and develops construction activity, Completed Permittee Registration Application. Section 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work, Section 3.3 The Permit Application Process, Section 3.6 Emergency Work and Special Circumstances, http://www.nyc.gov/html/dot/downloads/pdf/insurancereq.pdf, Instructions for Permittee Registration Application, Application for Roadway/Sidewalk Permit(s), Appendix A, Common Permit Types and Documents Needed, Appendix D, Other Agency and Utility Contact Information, Application for Governmental Work Permit(s), Section 3.5 Other Provisions Pertaining to Permits, Application to Renew Governmental Permit(s), The permit application is available online, Chapter 4, Section 4.5 Street Construction Inspections and Enforcement, Request for Roadway/Sidewalk Permits during Embargo Periods form, Section 4.3 Street Restoration Requirements, Building Operations/Construction Activity Permits, Minimum Clearance Requirements For Transformer Vaults, Department of Design and Construction, Construction Director Borough Offices, Department of City Planning Borough Offices, Department of Parks and Recreation Borough Offices, Environmental Control Board Borough Offices, Chapter 2Advance Notice and Coordination of Planned Street Work, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Street Arterial Maintenance (SAM) Release Form for Protected Streets, Application to Renew Governmental Work Permit(s), Application to Reissue Governmental Work Permit(s), Written Consent from Property Owner to install and maintain a canopy, Temporary Construction Signage Purchase Directions, Construction Project Information Signs (CPIS) Directions, Engineering Package for Vault Application, Section 3.4 Canopy Authorization and Permits, Weekly milling, resurfacing and concrete repair schedules, Insurance and Indemnification Requirements from Title 34, Rules of the City of New York, Critical Streets list in the Highway Rules, Section 2-07 (c) (5), Franchise, Concession or Revocable Consent, Application to Re-issue Government Permits, Additional information about historic districts, Construction Embargos at the Special Traffic Advisory link, Request for Roadway/Sidewalk Permits during Embargo Periods, Information regarding sidewalk violations, Pave Street-W/ Engineering & Inspection Fee, Place Equipment Other Than Crane Or Shovel, Franchise Installations (Overhead Structures), Electric power lines, cables, conduit and lighting cables, Gas, oil, steam, petroleum and gaseous materials, Communications, alarm, signal lines, cables and conduit, Reclaimed water, irrigation and slurry lines, REQUIRES DOB APPROVAL or REQUIRES DOT FRANCHISE, CONDUIT CONSTRUCTION (CABLE, TELECOMMUNICATION) AND FRANCHISE, REQUIRES DOT HIGHWAY INSPECTION QUALITY ASSURANCE (HIQA) APPROVAL, REQUIRES APPROVAL FROM DOT SIGNALS UNIT or, REQUIRES DOB APPROVAL (IF IN CONJUNCTION WITH A NEW BUILDING OR BUILDING ALTERATION), FRANCHISE INSTALLATION (OVERHEAD STRUCTURE), REQUIRES APPROVAL FROM DOT STREET LIGHTING UNIT, Franchises, Concessions and Consents - (212) 839-6550, MTA/NYCT - Bus Operations - (646) 252-5517 or (646) 252-5544, 18 inches (maximum 24 inches) from the grating edge perpendicular to curb, Division of Review & Construction Compliance - (718) 595-5223 or Plan Review Section - (718) 595-5191, * Maintain minimum Clear Path requirement (Below), General customer service - (800) ASK-USPS, 5 feet offset along the curb line (Not Permitted in front), Department of Consumer Affairs - 311 or (212) NEW-YORK outside the five boroughs, Con Ed, Verizon, National Grid, etc. How Much Do Survivor Contestants Get Paid After Taxes, Abner Creek Academy Lunch Menu, Articles N

OFFICE. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. IES classification of lighting based on its photometric properties. New York, NY 10013 Kew Gardens, NY 11424 FULL CURB LANE RESTORATION WOULD BE REQUIRED FOR 8' WIDTH OF CURB LANE AND THE LENGTH OF ALL CUTS PLUS ANY LL14 CUTBACKS. Fax: (718) 816-9194 APPROVAL FROM THE LANDMARK PRESERVATION COMMISSION IS REQUIRED BEFORE WORK COMMENCES. Incorrect Information on File If a permittees 24/7 phone number, address or other contact information is inaccurate or has changed without being updated, all future permit requests may be placed on hold until the information is updated. Homeowners applying for Sidewalk Construction permits who intend to do the work themselves do not need to register. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. 55 Water Street, Concourse Level Any foundation material not meeting specifications must be removed. Additional requirements are contained in Sections 2-02 and 2-05 of the Highway Rulesand should be consulted before any work is performed on the street. FULL BUILDING LINE RESTORATION IS REQUIRED FOR WIDTH OF THE ROADWAY. Attn: Forestry FIRE/EMERGENCY ACCESS/EVACUATION POINTS FOR ALL BUILDINGS CANNOT BE ENCROACHED. Concretemust be poured and finished in accordance with NYC DOT Standard Highway Specifications. "Base course" refers to the layer of material below the wearing course. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The NYC DOT Bureau of Permit Management and Construction Control (the Bureau) is responsible for overseeing all construction-related permitting. Registration applications should be printed on 8 1/2"x 14" paper. A sidewalk is the portion of a street, intended for the use of pedestrians, between the roadway and adjacent property lines. Cranes may require permits from DOB in addition to NYC DOT. New York, NY 10038 FULL INTERSECTION RESTORATION WILL BE REQUIRED WHEN MORE THAN 50% OF THE INTERSECTION IS EXCAVATED. Street Arterial Maintenance (SAM) hold A Street Opening Permit request to perform work on a protected street will automatically have a SAM hold placed on it if the proposed work start date is within 18 months of the street being resurfaced/reconstructed. Print his/her name and title and provide a signature. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. CPO holds will typically be released by DDC if the proposed work does not interfere with its schedule. The second permit for canopy maintenance is automatically placed on a. NYC DOT issues permits for two types of vaults: building vaults and transformer vaults. Bronx, NY 10457 The permittee may apply for a renewal online, or in-person by accessing either theApplication to Renew Permitsor theApplication to Renew Governmental Permit(s). Included are topics about Policy, Procedures, Specifications and Design Standards (Manuals, Guidelines, and Computer Aided Design and Drafting drawings). Department of Transportation These include major construction related projects or planned traffic enhancements (e.g., Second Avenue subway, bus rapid transit, water tunnel route), or where there are significant traffic issues (e.g., thru streets, exits and entrances to major tunnels and bridges). STLRES-RESTORE AS PER SKETCH #3 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. (If the homeowner is using a contractor, the contractor must be registered with NYC DOT and must take out the permit.) (718)786-8589 OR (718)786-8407, ONE SPEED REDUCER IS LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. 3.1 General Provisions For Construction-Related Permits Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. (NAME AT LEAST 2). Fax: 718-556-7305, The Bronx (212) 839-8856, The Bronx * Clear Path (pedestrian walkway): This directive is intended to provide pedestrians with the maximum amount of safety and space to traverse the sidewalk. If work is planned through the HE period, the critical reasons for the work must be included in the Work Description field of the application. DOTs lighting-levels and uniformity guidelines are based on those established by the IES Roadway Lighting standard RP-8-14 (or more stringent where needed). NYC DOT's concrete repair schedule for roadways, sidewalks and other assets in the street can also be accessed from this link. font size. NYC DOT also routinely meets with utility companies and others who perform street excavations to inform these organizations of upcoming events and major construction projects with which NYC DOT is involved. PLACE LEFT LIGHTED ARROW BOARD 24/7 NE CORNER OF AMSTERDAM AVE/W.60 ST. NO IMPACT ON 4 TRAVEL LANES AT ANY TIME. All of these signs are metal and include the agency name and sign code. No attachments of any kind are permitted on a canopy, including, but not limited to temporary or permanent signs, balloons, streamers, flags, banners or pennants. Fax: (718) 430-4663 THIS WORK HAS PRIORITY OVER OTHER NON-EMERGENCY WORK ON STREET SEGMENT. Applicants must submit a completed permit application. Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. If the insurance is not current, the request will be denied. A Full Closure Review (FCR) hold is triggered when a street is closed for 90 days. View more information and instructions for obtaining a revocable consent. Building Operations/Construction Activity Permits are generally taken out by entities that perform construction activities, including developers and contractors. All street lighting designs must be approved by DOT Street Lighting Engineering Unit. Registered Permittees may apply, pay for and print their permits anytime anywhere using the NYCStreets Permit Management online system. See, Utilize recycled content in paving materials. nyc.gov/dot. For questions, Monday to Friday from 8:30 AM until 5:00 PM. 6. MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. The pedestal is monolithically poured with the foundation. MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. MUST COMPLY WITH DEP NOISE REQUIREMENTS. Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. The concrete base must be restored at the same grade as the existing base; at no time may it be brought up to the asphalt course unless authorized by NYC DOT. If it is determined to be unfeasible, the pending permit will be rejected. MUST COORDINATE WITH RESIDENT ENGINEER NYSDOT MR.WONG AT 718-499-7075 PRIOR TO WORK. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. The requested permit must be appropriate for the type of work that is planned. The Queens borough permit office is located in Queens Borough Hall. Check traffic advisories. DURING RESTORATION SAW CUTTING IS REQUIRED AS PER DRAWING H-1042A, THE PERMITTEE IS NOT PERMITTED TO ENTER, OCCUPY OR USE ANY PUBLICLY-OWNED OR PRIVATELY OWNED, NON-PAVED, LANDSCAPED OR NON-LANDSCAPED LOCATION WITHOUT SPECIFIC WRITTEN PERMISSION. 47-40 21st Street 10 Richmond Terrace, Room 309 A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. 811 or 800-272-4480. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHEAST QUADRANT OF THE INTERSECTION. Division of Traffic Engineering Fax: (212) 361-1900, Queens MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. Office hours: 8:30 AM-5:00 PM, Manhattan 22 Reade Street, 6th Fl. MICROSTATION SHEET MODELS. It draws from a wide range of resources and experience to present a coherent set of choices for street design. CTDOT_Traffic . Brooklyn, NY 11241-0103 THE ROADWAY AND/OR SIDEWALK SHALL BE REPLACED IN-KIND. Manhattan / Central Permit Office When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. The hold is to review the proposed work and set conditions for the work and/or restoration. THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications. (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) > 645 Signs: . NYC DOT may order a vault licensee or the owner of the premises where the vault is located to fill in an abandoned vault. WORK IS PERMITTED BETWEEN 9AM AND 6PM SATURDAY FOR THE SOLE PURPOSE OF DISCONNECTING THE CUSTOMER FROM THE OLD GAS MAIN, AND RECONNECTING THE CUSTOMER TO THE NEW GAS MAIN. Transverse SlopeSidewalks must be laid to pitch from the building line toward the curb. To request release of a CAN hold, the applicant must contact the HIQA borough office in the borough in which the canopy is installed to arrange for a final inspection following canopy installation. DO NOT PLACE ON MTA/NYCT ANTENNA POLES. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR FULL INTERSECTION RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Applicants should indicate on the application, Application for Governmental Work Permit(s), their name and the name of the governmental agency or authority for which they are working. Sidewalk Construction Permits are designated as the "04" permit series, meaning all permits in this category begin with "04". Manhattan.Forestry@parks.nyc.gov In order to maintain world-class streets, permits must be obtained for the work performed in the street. Standard Drawings are not currently available for download from the shaded states. Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. DOT SIGNALS APPROVED PLANS. Office hours: 8:30 AM-4:30 PM, Brooklyn The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. Some of the requirements include but are not limited to: Expansion JointsExpansion joints must be placed at 20-foot intervals, expansion joint filler material must be placed to the full depth of the sidewalk, and all expansion joints must be recessed and sealed. MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 9 AM TO 2 PM AND 3:30 PM TO 6 PM MON. To request a release of a SAM hold, the borough ASHO must be contacted to discuss the work and allow the ASHO to determine the extent of the restoration requirements. Whenever a permit has been issued in error and the conditions are such that the permit should not have been issued. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. ALL WORK MUST BE PREAPPROVED BY LANDMARK PRESERVATION COMMISSION. Tel: 212-720-3300 Other requirements may apply to the movement of cranes within city limits, such as daily or annual over-dimensional travel permit(s) as issued by NYC DOT. An Occupancy of Sidewalk Permit is required when either more than 3 feet from the property line is obstructed by a fence or a minimum of 5 feet of clear path cannot be maintained for pedestrians, or as otherwise stipulated. The contact information and hours of operation for all Permit Offices can be found in Appendix C, NYC DOT Contact Information. WORK SHALL BE PERFORMED IN ACCORDANCE WITH NYCDOT'S SPECIAL EVENTS OFFICE REQUIREMENTS RELATED TO A SPECIAL EVENT, AS IDENTIFIED IN THEIR EMAIL, WHICH MUST BE KEPT ON-SITE WITH ALL ACTIVE PERMITS WHILE THE APPROVED WORK IS BEING PERFORMED. 4. Its overall goals are both far-reaching and vital: sustaining the city's investment in its streets, enhancing access to subsurface infrastructure and minimizing transportation and community disruptions. Fax: (212) 860-1359 THIS PERMIT INCLUDES AUTHORIZATION FOR THE STORAGE OF EQUIPMENT (OTHER THAN CRANES) AND MATERIALS ON THE JOB SITE ONLY, INCLUDING JERSEY BARRIERS IF APPLICABLE. If all the documentation is accepted, pre-determined permit stipulations are added to the permit and the application is sent for processing. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. NYC DOT registers permittees, and coordinates and issues permits for construction-related activity on streets. http://mutcd.fhwa.dot.gov back to top N New York 811, Inc. An application for a Street Opening Permit on a protected street will automatically be placed on a Street Arterial Maintenance (SAM) hold if the proposed work is to start within 18 months of the street being resurfaced or reconstructed. In order to apply for an embargo waiver, a Request for Roadway/Sidewalk Permits during Embargo Periods form must be submitted for review and consideration to the Permit Office. CLOSURE GRANTED AT REQUEST OF SCA LETTER. The second option is available for applicants who do not have the technology to use the above procedure. Transformer vaults are typically installed, owned and maintained by an electric utility company. Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. 8:30 AM to 4:30 PM, Lower Manhattan (south of Canal Street) NO NOISY OPERATIONS MAY OCCUR AFTER 10:00 PM. All other inquiries: (212) 748-6610 However, if extraordinary conditions are present, the applicant may be asked to meet with OCMC. Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York. Division of Review & Construction Compliance (718) 595-5223 or (212) 839-9561/9566 The form must be completed and faxed to NYC DOTs Emergency Authorization Unit (EAU), which will confirm that the applicant's insurance is current and that the location requires an EAN. For complete NYC DOT requirements regarding the performance of work in the street, please consult the Highway Rules and NYC DOT specifications. VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. Cobra Head fixture on standard lamppost This chapter, which constitutes the current DOT Street Lighting Catalogue, outlines options for street and pedestrian lighting for New York City streets, bikeways, pedestrian bridges, pedestrian malls, plazas, and parks. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. SPECIFICATIONS. Queens The permittee must attach a copy of the original permit to the application when requesting a re-issuance and all applicable reviews and fees will apply. All other times - (718) 433-3340, From 7:00 AM to 3:30 PM, Monday to Friday: (212) 839-9697/99 or 9688 CRITERIA & PROTOTYPE FOUND AT: THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB LANE ONLY RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. NYC DOT hosts borough-level meetings to discuss the scheduling of upcoming resurfacing projects with utility companies and other potential street excavators. By eliminating manual steps, most permit requests now may be approved and issued within 1-2 business days. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The Bronx The term "street" means a public street, avenue, road, alley, lane, highway, boulevard, concourse, parkway, driveway, culvert, sidewalk, crosswalk, boardwalk, viaduct, square or place, except those streets adjacent to any waterfront property designated as a marginal street on a city map. 40 Worth Street 8th Floor THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR 12"BEYOND FURTHEST CUT TO CURB LINE FOR ALL CUTS AS AGREED TO W ITH THE BOROUGH ASHO'S OFFICE. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. Projects requiring sidewalk closure may require additional permits. The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. RESTORATION OF ROADWAY WHICH HAS GREEN COLORED BIKE LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF GREEN # 105953 RIDE-A-WAY COATING MATER'L MFG'D BY FLINT TRADING INC OR EQUIVALENT. IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. AND THAT THE PREVAILING SCALE OF UNION WAGES SHALL BE THE PREVAILING WAGE FOR SIMILAR TITLES AS ESTABLISHED BY THE FISCAL OFFICER PURSUANT TO SEC. Typically, permits must be kept at the work site or designated field headquarters at all times and must be made available for inspection. SignageSigns must be displayed at the work site or at 100-foot intervals along a series of excavations or continuous cuts indicating the name of the entity performing the work, the name of the entity for whom the work is being performed and, if applicable, the name(s) of the subcontractor(s). The applicant must satisfy all of the requirements listed in section 2-02(a) (3) of the. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. Fax: (718) 965-7753 WORK 9 PM TO 6 AM NIGHTLY. DOT is also testing solar-powered lighting at select locations in flood-prone areas. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Apply for a parking permit. A sketch showing the canopy dimensions, location and all street facilities and furniture within 15 feet of both sides of the proposed canopy. Each applicant must obtain and provide Worker's Compensation insurance in accordance with the laws of the State of New York from a licensed insurance company. WORK HOURS 7 AM - 10 PM MON-FRI, AND 10 AM - 7 PM SAT AND SUN. 5. These forms may also be found inAppendix B, Forms. The organization of the Street Works Manual generally follows the chronological process of planning and undertaking work in the street. WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF ANY OTHER JURISDICTION SUCH AS PRIVATE PROPERTY, STATE, FEDERAL ETC., IT IS THE PERMITTEES RESPONSIBILITY TO DETERMINE THE PROPERTY OWNER AND OBTAIN THE WRITTEN APPROVAL. WORK 9 AM TO 7 PM SATURDAY AND 10 AM TO 7 PM SUNDAY. ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. VERMEER CUT OF TRENCH. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. number as provided by the Internal Revenue Service (IRS). (5mb). PAVEMENT MUST BE RESTORED IN KIND. CONNECT WITH US. A single PDF of the 619 Standard Sheets is available at the . To request release of a Revenue hold, the permittee must contact NYC DOT's Fiscal Affairs Office to arrange for payment of outstanding bills. Attn: Forestry Real-Time Traffic Conditions & Cameras. Office hours: Applications accepted, only from 8:00 AM to 11:30 AM; OCCUPY TWO 11 FOOT LANES 12:01 AM TO 5 AM NIGHTLY. Outlined below are the basic procedures in applying for a Sidewalk Repair Permit by mail: The New York City Click here to download. THE VMS BOARD MUST STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF SUCH CLOSURE. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. COMPLY WITH DOT STANDARD #H1042C. Canopy authorizations and permits are required to place a canopy over the sidewalk. BY SUBMITTING THIS APPLICATION AND/OR RENEWAL REQUEST, THE PERMITTEE CERTIFIES ITS COMPLIANCE WITH ALL APPLICABLE CITYWIDE CONSTRUCTION NOISE MITIGATION REQUIREMENTS INCLUDING, BUT NOT LIMITED TO THE DEVELOPMENT OF A COMPLIANT NOISE MITIGATION OR ALTERNATE NOISE MITIGATION PLAN. WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. This information should be used to plan work before streets go into protected street status. TO FRI. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. ROADWAY MUST BE RESTORED IN KIND. Following are the specific steps for canopy authorizations and permits: A permit must be obtained to install the canopy at the approved location (Erect Canopy Permit from the "01" Street Opening Permit series). IF MULTIPLE LANES ON GOWANUS IN SAME DIRECTION AS MILLING, NO MILLINGY WORK MAY OCCUR. 40 Worth Street 8th Floor POSITIONING OF TRAFFIC SIGNS (TOTAL OF . This form cannot be used if the permit has already expired. RESTORE ALL TRAVEL LANES TO TRAFFIC. WHEN SCHOOL IS OUT MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 7 AM TO 6 PM MON. POST SIGNS MEETING NYCDOT SPECIFICATIONS FOR DIRECTING PEDESTRIANS TO OPPOSITE SIDEWALK. CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR EXTENDED TRENCH MORE THAN REGULAR CUT-BACK AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. If the applicant intends to do work associated with a Franchise, Concession or Revocable Consent Agreement, the applicant must have a copy of the Agreement prior to applying for a permit. Permit windows at the central Permit Office. If no changes are required, the permit will be released. 8:30 AM to 4:30 PM, Manhattan New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . RESTORATION OF ROADWAY WHICH HAS RED COLORED BUS LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF TERACOTTA #103856 RIDE-A-WAY COATING MATER'L MFG'D BY INTERGRATED PAVING CONCEPTS INC OR EQUIVALENT. OCCUPY 15 FEET OF E/S CURB LANE. Find community presentations. Fax: (212) 788-3086, New York State Department of Environmental Conservation (DEC) A permit is required to place any construction trailer or similar structure in the street. DESIGNATED LANDMARK AREA. (718) 391-1937 ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. THIS EXECPTION DOES NOT APPLY IF STIPULATION 014 IS ALSO APPLIED TO THIS PERMIT. Crane placed on the street for construction activity. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Some of the requirements include, but are not limited to the following, where the applicant must: New York 811 is a nonprofit organization that acts as a communications link between utility companies and individuals planning any digging activity in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island. THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. The applicant can also request a new vault license for an existing vault by submitting SCARA plans and make a one-time license fee of $2 per square foot. Signs must be conspicuously displayed and face the nearest curb line. While the situation is evolving, the agency remains committed to applying the principles and proven treatments included in the Street Design Manual to support the health and safety of all New Yorkers. DESIGNATED AS A FULL DEPTH CONCRETE ROADWAY THAT MUST BE RESTORED IN KIND AS PER DOT STANDARD SPECIFICATION #1042A&B. NYPD AGENTS AND VMS BOARDS REQUIRED AS PER MEC01-36. In-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted to the central Permit Office in Manhattan. These applications can be submitted online using NYCStreets. If the installed canopy fails final inspection, HIQA will reject the canopy maintenance permit and notify the applicant of the rejection. The applicant will also be notified of any corrective action necessary and recourses available. NYC Parks & Recreation Permit Review is the process by which NYC DOT reviews permit applications and supporting documentation and makes determinations regarding the issuance of permits and permit stipulations. Unauthorized removal of muni-meters is prohibited. Fax: (718) 858-0069, Manhattan Brooklyn, NY 11202 Home | Pedestrian Ramp Program The Office of Construction Mitigation and Coordination (OCMC) reviews all construction permit applications and develops construction activity, Completed Permittee Registration Application. Section 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work, Section 3.3 The Permit Application Process, Section 3.6 Emergency Work and Special Circumstances, http://www.nyc.gov/html/dot/downloads/pdf/insurancereq.pdf, Instructions for Permittee Registration Application, Application for Roadway/Sidewalk Permit(s), Appendix A, Common Permit Types and Documents Needed, Appendix D, Other Agency and Utility Contact Information, Application for Governmental Work Permit(s), Section 3.5 Other Provisions Pertaining to Permits, Application to Renew Governmental Permit(s), The permit application is available online, Chapter 4, Section 4.5 Street Construction Inspections and Enforcement, Request for Roadway/Sidewalk Permits during Embargo Periods form, Section 4.3 Street Restoration Requirements, Building Operations/Construction Activity Permits, Minimum Clearance Requirements For Transformer Vaults, Department of Design and Construction, Construction Director Borough Offices, Department of City Planning Borough Offices, Department of Parks and Recreation Borough Offices, Environmental Control Board Borough Offices, Chapter 2Advance Notice and Coordination of Planned Street Work, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Street Arterial Maintenance (SAM) Release Form for Protected Streets, Application to Renew Governmental Work Permit(s), Application to Reissue Governmental Work Permit(s), Written Consent from Property Owner to install and maintain a canopy, Temporary Construction Signage Purchase Directions, Construction Project Information Signs (CPIS) Directions, Engineering Package for Vault Application, Section 3.4 Canopy Authorization and Permits, Weekly milling, resurfacing and concrete repair schedules, Insurance and Indemnification Requirements from Title 34, Rules of the City of New York, Critical Streets list in the Highway Rules, Section 2-07 (c) (5), Franchise, Concession or Revocable Consent, Application to Re-issue Government Permits, Additional information about historic districts, Construction Embargos at the Special Traffic Advisory link, Request for Roadway/Sidewalk Permits during Embargo Periods, Information regarding sidewalk violations, Pave Street-W/ Engineering & Inspection Fee, Place Equipment Other Than Crane Or Shovel, Franchise Installations (Overhead Structures), Electric power lines, cables, conduit and lighting cables, Gas, oil, steam, petroleum and gaseous materials, Communications, alarm, signal lines, cables and conduit, Reclaimed water, irrigation and slurry lines, REQUIRES DOB APPROVAL or REQUIRES DOT FRANCHISE, CONDUIT CONSTRUCTION (CABLE, TELECOMMUNICATION) AND FRANCHISE, REQUIRES DOT HIGHWAY INSPECTION QUALITY ASSURANCE (HIQA) APPROVAL, REQUIRES APPROVAL FROM DOT SIGNALS UNIT or, REQUIRES DOB APPROVAL (IF IN CONJUNCTION WITH A NEW BUILDING OR BUILDING ALTERATION), FRANCHISE INSTALLATION (OVERHEAD STRUCTURE), REQUIRES APPROVAL FROM DOT STREET LIGHTING UNIT, Franchises, Concessions and Consents - (212) 839-6550, MTA/NYCT - Bus Operations - (646) 252-5517 or (646) 252-5544, 18 inches (maximum 24 inches) from the grating edge perpendicular to curb, Division of Review & Construction Compliance - (718) 595-5223 or Plan Review Section - (718) 595-5191, * Maintain minimum Clear Path requirement (Below), General customer service - (800) ASK-USPS, 5 feet offset along the curb line (Not Permitted in front), Department of Consumer Affairs - 311 or (212) NEW-YORK outside the five boroughs, Con Ed, Verizon, National Grid, etc.

How Much Do Survivor Contestants Get Paid After Taxes, Abner Creek Academy Lunch Menu, Articles N


برچسب ها :

این مطلب بدون برچسب می باشد.


دسته بندی : super singer soundarya marriage photos
مطالب مرتبط
acro police check cost
paige and chris married at first sight
ارسال دیدگاه